Dangerous cycling
Following one incident involving a death from one person's dangerous cycling, a new law is proposed.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Waterbeach Cycling Campaign:
Following one incident involving a death from one person's dangerous cycling, a new law is proposed.
sound+fury // 1 thread
I'd like some Camcycle wisdom on buying a second hand bike.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Outline planning permission with all matters reserved except for access for the erection of up to 50 dwellings (use class c3) and associated works, including access, car and cycle parking, open space and landscaping
Land Off Beach Road, COTTENHAM, CB24 8RL
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0012/18/OL
South Cambridgeshire
Application reference : S/0012/18/OL
Created by Roxanne (Cycling Campaign Officer) // 3 threads
The Ely to Cambridge Transport Study is a wide-ranging multi-modal study which has made recommendations on the transport schemes needed to accommodate the major development planned at a new town north of Waterbeach, Cambridge Northern Fringe East (CNFE) and the Cambridge Science Park (CSP). The study has three strands:
- Strand 1 looks at the overall transport requirements on the corridor
- Strand 2 looks at the specific requirements for growth at Waterbeach
- Strand 3 looks at the specific requirements for growth at CNFE/CSP
The commission has delivered:
- An options study and Strategic Outline Business Case for the overall package of
interventions on the Ely to Cambridge corridor;
- A transport study that identifies the infrastructure package and phasing of that
package to provide for the transport demand of the development of a new town north
of Waterbeach,
- A transport study supported by modelling which provides evidence for the level of
development which could be supported in the CNFE/CSP area and its phasing, in transport terms.
The scope of the study was drawn up to incorporate three separate, but interlinked issues; namely the need for a Strategic Planning Document or Area Action Plan for both Waterbeach New Town and the CNFE, hence providing a Transport Evidence Base for Plan Making as required by National Planning Practice Guidance. Early thinking was also required on the requirements of the whole corridor to inform Tranches 2 and 3 of delivering the Greater Cambridge City Deal.
The study is separate to, but links with the A10 Ely to King’s Lynn Study which was reported to the Committee in September and to the M11-A47 Extension Study which has been commissioned by the Cambridgeshire and Peterborough Combined Authority and is due to report in summer 2018.
Created by Hilary Costello // 1 thread
My friend was knocked off her bike by a grey taxi on Milton Road on Friday Feb 2 2018 between 8:40-8:45 am. She ended up in the middle of the road and no one stopped. She went to A&E and is thankfully OK, mostly just shaken up and bruised.
She has reported the accident to the police who said they will mark it as an incident but not investigate. I've walked out to where it happened and there are cameras at the green end road/milton road intersection and at the guided busway that could help identify the taxi. Does anyone have any advice on how we could push the matter forward? It seems wrong that a taxi driver can hit someone, drive away and not even a little effort is put in to investigate?
Obviously a big deal for Waterbeach and surroundings. I'll restrict myself to cycling-related notes:
Transport Assessment:
3.1.6 [Over 600 HGV movements per day, albeit many seem to be already occurring on-site.]
3.3.4 ... Whilst this is not considered to be a
significant issue for experienced cycle users, it must be recognised that the
A10 corridor does operate under 60mph national speed limit controls and is
used for regular large HGV journeys. Such busy high speed routes typically
do not represent an attractive cycle option for many potential cycle users
3.3.5 It is understood that longer term CCC aspirations include the delivery of a
dedicated cycle greenway route to Waterbeach village & the proposed
Waterbeach Barracks / Airfield re-development, which could include for
extensions towards the Waterbeach WMP site. Such proposals are believed
to still be at a relatively early stage.
(Site is very close to the Cambridge Research Park, which will have a cycle link built to the new Waterbeach development)
Cycle Shelter:
For employees and visitors they are using the same off-the-shelf Broxap cycle shelter with substandard 800mm spacing that we objected to at the Science Park.
...
I think that our interest would be in ensuring that they properly integrate into any surrounding cycle network that is created by the Waterbeach development and that people cycling and walking are protected from the HGVs by having separated infrastructure and not sharing space (e.g. the entrance to the site for people cycling should be separate from the entrance for HGVs).
Application for full planning permission for the construction and development of a Waste Recovery Facility (Waterbeach Waste Recovery Facility â WWRF) at Levittâs Field, Waterbeach Waste Management Park (WWMP), Ely Road, Cambridge comprising the erection and operation of an Energy from Waste Facility to treat up to 250,000 tonnes of residual waste per annum, Air Cooled Condensers and associated infrastructure: including the development of an internal access road; office/welfare accommodation; workshop; car, cycle and coach parking; perimeter fencing; electricity sub-stations; weighbridges; weighbridge office; water tank; silos; lighting; heat off-take pipe; surface water management system; hardstanding; earthworks; landscaping; and bridge crossings.
Levittâs Field, Waterbeach Waste Management Park, Ely Road,, Waterbeach, Cambridge, CB25 9PQ
http://planning.cambridgeshire.gov.uk/swift/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3372/17/CW
Cambridgeshire
Application reference : S/3372/17/CW
Created by Matthew // 1 thread
The Broxap 'Cambridge' Cycle Shelter (BXMW/CA/1) is intended and marketed to fit 24 cycle spaces provided by two rows of six Sheffield stands. The shelter is 5,000 mm long, which means that the spacing between Sheffield stands is only 800 mm, with 500 mm spaces on either side of the row:
500 + 800 + 800 + 800 + 800 + 800 + 500 = 5,000
https://www.broxap.com/cambridge-cycle-shelter.html
The Cambridge Local Plan (2006) specifies that spacing between Sheffield stands should be 900 mm and newer advice suggests 1,000 mm.
Should we write to the manufacturer and ask that they revise their design, especially if they intend to market this as a 'Cambridge' cycle shelter?
Proposal to demolish existing 24-space cycle parking (and a variety of other things) and renovate, including 3 new Broxap BXMW/CA/1 'Cambridge' Cycle Shelters with claimed 72 cycle parking spaces total. SCambs requirement seems to be 76 spaces, so slightly short.
More alarmingly, it appears that the Broxamp 'Cambridge' Cycle Shelters are specified from the manufacturer to fit two rows of six Sheffield stands at 800mm centre-to-centre spacing, significantly below requirements!
The applicants are simply installing what they believe are industry standard cycle shelters, but it seems that Broxap does not comply with typical cycle parking standards.
Two storey entrance extension. External repairs to existing hard and soft landscaping. Erection of bin store and cycle shelter. Internal and external alterations.
Unit 306,Cambridge Science Park, Milton Road, Cambridge, CB4 0WG
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/4537/17/FL
South Cambridgeshire
Application reference : S/4537/17/FL
Created by Matthew // 1 thread
https://www.gov.uk/government/consultations/proposals-for-the-creation-of-a-major-road-network
The latest in the government's insatiable thirst for blowing money on roads (induced demand, what's that?) might have a silver lining as one of the objectives is 'support all road users'. I think we should submit a response. Basic outline: they should apply IAN 195/16 on this proposed Major Road Network.
Regarding Cambridge, the most immediately affected road would be the A10 north of the A14, and possibly south of Trumpington. The 'Major Road Network' in the vicinity of is the A14, M11, A11, A505 and the A10.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Change of use of existing two storey 3-bedroom dwelling house to two separate 1 bedroom flats.
78 Kings Hedges Road Cambridge CB4 2PA
Cambridge
Application reference : 17/2148/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
One for the Waterbeach campaign. Insufficient information about cycle parking provision.
Erection of dwelling
14, Bannold Road, Waterbeach, Cambridge, Cambridgeshire, CB25 9LQ
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/4094/17/FL
South Cambridgeshire
Application reference : S/4094/17/FL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Planning Application Ref:
S/4113/17/FL
Registration Date:
21-Nov-2017
Decision Date:
Application Type:
Full Planning
Extension of time to:
Parish:
Waterbeach CP
Main Location:
Land adjacent No.s 30 & 32 Burgess Road, Waterbeach
Full Description:
Proposed development to erect 1No. 3bed and 1No. 4bed dwelling houses at Burgess Road.
Status:
Out for Consultation
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of existing buildings and redevelopment for a 345 sqm convenience store, 10 apartments and 6 houses, together with associated car and cycle parking and landscaping.
Land at the corner of Capper and Cody Ro, Lancaster & Walmington House, Capper Road, WATERBEACH, CB25 9LY
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3865/17/FL
South Cambridgeshire
Application reference : S/3865/17/FL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolish Existing Dwelling and replace with 3No. Traditional Townhouses and associated access
7, High Street, Milton, Cambridge, CB24 6AJ
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3975/17/FL
South Cambridgeshire
Application reference : S/3975/17/FL
Dedicated space for cycling on trains
Created by Matthew // 1 thread
'My ambition is to ensure that people with physical and hidden disabilities have the same access to transport and opportunities to travel as everyone else. This consultation seeks to understand what more needs to be done to improve transport accessibility and is my first major action as Accessibility Minister.'
We should respond to this consultation.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Residential re-development comprising one 2xbed unit, seven 1xbed units and six studio units, along with access, car and cycle parking and associated landscaping following demolition of existing buildings on site
Lovell Lodge 365 Milton Road Cambridge CB4 1SR
Cambridge
Application reference : 17/1709/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of existing storage buildings and erection of six dwellings, including creation of access from Bannold Road, associated garages, hardstanding and landscaping.
Land to the East of 95, Bannold Road, WATERBEACH, CB25 9LQ
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3399/17/FL
South Cambridgeshire
Application reference : S/3399/17/FL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Change of use from single C3 Use Class dwellinghouse to 2 self-contained 1 bedroom flats and 1 self-contained 2 bedroom flat. Single storey rear extension, roof extension incorporating rear dormer, and Juliet balcony at first floor. Associated hardstandings, amenity space, and parking.
83 Lovell Road Cambridge CB4 2QW
Cambridge
Application reference : 17/1625/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Change of use application from B1(a) office use to a car licence testing centre (sui generis) use
Brookmount Court Kirkwood Road Cambridge CB4 2QH
Cambridge
Application reference : 17/1420/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
This planning application was missed when it was registered in March 2015 and decided in March 2016. Posting here now as amendments and conditions may be relevant to comment on.
Planning Application Ref: S/0630/15/FL
Registration Date: 11-Mar-2015
Decision Date: 03-Mar-2016
Application Type: Full Planning
Extension of time to: 02-Mar-2016
Parish: Milton CP
Main Location: 250-289, Cambridge Science Park, Cambridge, CB4 0WE
Full Description:
Hybrid planning application for phased demolition of existing office buildings& phased redevelopment of plots 250-289 with three office/R&D (Bla/Blb) buildings (17,219m sq) & decked car park & associated development. Building one & car park applied for in full & buildings two & three applied for in outline
Created by Roxanne (Cycling Campaign Officer) // 1 thread
A planning application that was missed at the time of registration. A decision is now forthcoming and we may want to be aware of it.
16/2058/FUL | Three storey office development (B1 use). | Coulson Group William James House 50 - 55 Cowley Road Cambridge Cambridgeshire CB4 0WU
Summary from the Design and Access Statement:
This building comprises of an ‘L’ shape layout and extends to 3 storeys in height, comprising circa 1780sq.m of B1 office floor space, together with circulation spaces, welfare facilities, meeting rooms, and breakout space, amounting to circa 2593sq.m. An external car park for 103 cars is proposed. The existing number of spaces within the application site totals 55, and will be reconfigured to reflect the proposed site layout together with 48 new spaces. A secure cycle shelter will be provided with 88 new cycle spaces which also includes cycle parking for visitors. Refuge and recycling collections have been integrated into the proposal
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Installation of cycle hoops, removeable bollards, steel hoop barrier and covered seating area.
130 Cowley Road Cambridge CB4 0DL
Cambridge
Application reference : 17/1407/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Change of use of former Ministry of Defence rifle range building to an early years playgroup space, to include 2 dedicated drop off parking spaces; the use of an additional 8 parking spaces for staff and visitors; amendments to the external façades to provide new doors and windows; and associated landscaping works.
Building 2, former rifle range building for Ministry of Defence, Waterbeach Barracks, Denny End Road, Waterbeach, CB25 9PA
http://planning.cambridgeshire.gov.uk/swift/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0246/17/CC
Cambridgeshire
Application reference : S/0246/17/CC
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Plots 1 to 21 Cambridge Science Park, Plots 1 to 21 Cambridge Science Park, Milton Road, Cambridge, CB4 0WN
Full Description:
Demolition of existing buildings and erection of two four storey buildings for B1 use and a multi-storey car park, including access and landscaping
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
A Camcycle member is looking at starting a local campaign group with the aim of getting a cycleway to connect the villages of Horningsea and Waterbeach along the B1047.
Please share your ideas and advice for the route here.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by cobweb // 40 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Roxanne (Cycling Campaign Officer) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Al Storer // 2 threads
Cycling and Walking provision at Cambridge Science Park is poor. Lets try and get it fixed
Created by Anna Williams – Comms Officer // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Heather Coleman // 1 thread
I've had a letter from the council. Not sure if someone put a copy through my door as they knew I was interested in the Fen Road, Milton, as it's dated 30th June which is over two weeks ago.
I think "suface dressing" ie loose chippings, is a totally inappropriate treatment for a road which has not that much motor traffic and rather a lot of cycle traffic. The loose chippings will be a skid and physical hazard for cyclists for months to come.