Things tagged 'station'

limited to the area of Waterbeach Cycling Campaign:

5 issues found for 'station':

  • 21-month closure of cycle path from Cambridge North to Milton Road

    Anon // 1 thread

    At the end of this blog post, it's reported that the segregated cycle path from Cambridge North station to the north of the Business Park will be closed to cyclists from March 2019 to December 2020 (a period of 21 months), for utility works relating to development on the Cambridge North site. Cyclists are to be diverted to the south side path (along the busway); pedestrian access on the north side will apparently be maintained.

    In particular, this appears to prevent cyclist use of the recently opened gate at the south end of the Business Park for the duration of the works (unless perhaps one pushes one's cycle). Getting from or through Cambridge North to the Science Park will be less convenient, too.

    Full text from Camcycle blog post. (Robin Heydon tells me this information originally came from Brookgate.)

    Development at Cambridge North

    Early works have begun on the further development around Cambridge North, where new offices and a hotel will be built. Within the next couple of months, a major cyclist diversion will be put in place which reroutes cyclists accessing the station via the segregated path along Cowley Road. This will be closed to allow utility works from Milton Road down to the station. Cyclists will be redirected along the Busway cycleway from Milton Road. There will continue to be road access for cyclists to the industrial and residential units off Cowley Road (including the Camcycle office), but not beyond this point. Note that there will be a signifidant increase in construction traffic along Cowley Road.

    Please sign in to vote.
  • Cambridge North railway station

    Created by Robin Heydon // 15 threads

    New station that will serve the northern part of Cambridge, specifically the Science Park - but also by extension through the guided bus, villages to Northstowe.

    This provides a good opportunity to construct another section of the Chisholm Trail (especially a link over the river and on to Newmarket Road). We must also ensure that any footbridge provides facilities for those with bikes AND that there is adequate cycle parking.

    Please sign in to vote.
  • Proposed extra pedestrian and cycle access points to Cambridge Business Park.

    Created by Richard Taylor // 1 thread

    Proposal for three new pedestrian and cycle access points to Cambridge Business Park. The proposals are being made in light of the plans for an new station nearby.

    Representations from companies with premises on the business park - Redgate and Autonomy - have expressed concerns about security and the potential for people to try and park on the business park and then get on a train.

    The proposals are for the new accesses to be gated to restrict general public access.

    The proposals include a connection to the potential cycleway along the line of the disused railway.

    Cambridge Business Park Cowley Road Cambridge Cambridgeshire CB4 0WZ

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=NOCKJJDXMKB00

    Cambridge
    Application reference: 15/0919/FUL

    Please sign in to vote.
  • Milton road underpass closure

    Created by Cllr Ian Manning // 1 thread

    Separate thread about this to separate from the main rail station thread..

    The pedestrian/cycle underpass on Milton Road will be closed from August - December (currently) to facilitate rebuilding it for the busway extenstion.

    Road works will be in place during this time.

    Please sign in to vote.
  • HGV and LGV traffic on Nuffield Road

    Created by Klaas Brümann // 1 thread

    Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.

    Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.

    Petition: http://iitm.be/ChestertonTrafficReduction
    Picture Gallery: http://iitm.be/NuffieldRoad

    Please sign in to vote.

One library item found for 'station':

No planning applications found for 'station'.