Bicycle Culture
Resources, opportunities, ideas and opinions about bicycle culture in Cambridge
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Waterbeach Cycling Campaign:
Created by velocipedus@gmail.com // 12 threads
Resources, opportunities, ideas and opinions about bicycle culture in Cambridge
Created by cobweb // 32 threads
e.g.
https://www.gov.uk/government/news/cash-boost-to-get-england-cycling--2
Govt announces £20 million for cycling infrastructure improvements.
Martin Lucas-Smith // 2 threads
There are rumours that the AJC will be scrapped.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Winter gritting is essential for many cycleways and there have been problems in recent years.
Martin Lucas-Smith // 4 threads
This is a general issue aiming to collect together details of cycling and walking statistics in Cambridge as the years progress.
Created by velocipedus@gmail.com // 1 thread
International Cycling Safety Conference 2012, 7 Nov
Location: Helmond, The Netherlands
Costs: 150 Euro
Twitter hashtag: #safecycling2012
Several meetings, in each area committee location to discuss s106 money and how it should be spent. Details below.
http://www.cambridge.gov.uk/ccm/content/planning-and-building-control/developer-contributions.en
On a bi-annual basis, the funding for S106 projects is to be reviewed with Area Committee recommendations going to Cabinet for final approval.
This is a general, over-arching issue for discussion of helmet-related and cycle safety promotion strategic matters in Cambridge that periodically (and continually) arise.
How can we welcome new students / visitors to Cambridge?
Ideas include:
* Stall events
* Welcome to Cambridge bike ride
* Talks
* Dr. Bike / Bike sale / Trade-in / Bike Harvest
Created by Simon Nuttall // 2 threads
Every few years the City or County publish and refresh their give-away map.
This issue is to capture discussion about the map, including the details included on it, the style of the map and any inaccuracies or other changes that are needed.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Martin Lucas-Smith // 13 threads
Formal policies on health, with mention of cycling, need to be improved as a way of providing an additional tool to be used in transport and planning.
Martin Lucas-Smith // 33 threads
Collisions, 'accidents' and even occasional deaths involving cyclists remain an issue in Cambridge.
This Cyclescape issue is so we can collect the reports and debate approaches to tackling this issue through the media and through policy objectives.
There are a range of issues regarding cyclists breaking the law in Cambridge. This issue is intended as a container for strategic discussion of how this can be resolved.
There are of course many problems with drivers breaking the law, and discussions need to be in that context also, but this is issue is primarily for addressing the cycling side.
Created by Heather Coleman // 2 threads
This is a planning application variation for 42 Fen Road, Milton. Application no (south cambs) is S/0756/12/VC
Permission had been given, but I noted as I passed the other day, that there was an application for a variation. Looking at this, one item seems to be to vary the "cycle storage".
From the description in Addendum to Design, Access & Herigage Statement in plans and docs:
I quote
"The bin / cycle store has been relocated and enlarged to allow for a tool shed. It was felt that
the proximity of the previous store to the proposed dwelling had an adverse impact on the
street scene and cluttered up the entrance area. By setting it back within the garden space it
was felt this would positively enhance the character of the area. Additionally, as a temporary
structure it is felt this would not have any more of an impact on the surrounding trees than
the current position of the bin store."
Or if you look at the map, the cycle "storage" (should that be parking?) now appears to be round the back end of the garden, and as a hedge is shown surrounding the car parked at the front of the property, I am at a loss as to how it would be at all convenient to ever get a bike out of this shed, rather than just getting into the car.
Of note is the fact that this proposed house is about 15 yards off NCN 11. In one direction*; this gives a virtually traffic-free route almost into Cambridge city centre or to Waterbeach railway station. In the other direction, NCN 11 heads through Milton Country Park, leading almost directly to the local Tesco superstore as well as to the Coston bridge, Science Park, Guided Busway. Thus, it could be possible to live an almost entirely car-free existence at this location.
*Fen Road is erroneously described as a cul-de-sac in the application. It is to motor vehicles, but is in fact a through route to the city centre for cycles and pedestrians.
From the 2004 South Cambs local plan
"To promote the use of more sustainable modes of transport, such as public transport,
walking and cycling by making such modes more accessible, safer and more attractive
to use.," and "To promote sustainable travel by ensuring new development takes place in highly
accessible locations."
" To limit the amount of car parking provided in new developments, where appropriate,
to reduce over-reliance on the car." "adopting on-site and/or off-site design features that promote
access by non-car modes as far as practicable (including
walking and cycling) and facilitate and encourage their use"
Of course there appears to be nothing about accessibility of cycle parking cf car parking, unlike the City Council local plan.
Is it worth putting in an objection? The publicity end date is 5th June.
Created by Rohan Wilson // 10 threads
Turnstone, a consortium, is hoping to build a new town, to be named Denny St Francis, adjacent to Waterbeach (the barracks site, plus). Like any large development, cycling conditions need to be good.
Martin Lucas-Smith // 21 threads
The Cambridge City, South Cambridgeshire, County Council Strategic Transport and Spatial Planning Group are considering a new Transport Strategy for Cambridge (TSC).
Other transport strategies will no doubt emerge in future.
Martin Lucas-Smith // 6 threads
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
Nigel // 0 threads
Department for Transport press release 23 March 2012:
http://assets.dft.gov.uk/press-releases/20120323a/east-england-fact-sheet.pdf
Cambridgeshire "Better Bus Area Fund"
Cambridgeshire will receive £1,724.000 to improve accessibility, bus journey times on key bus routes in Cambridgeshire. The changes will include new traffic management on four corridors into the city, bus priority, upgraded buses, improved interchanges (including with Guided Busway), smart ticketing top-up on street and real time passenger information. For further information, go to http://www.cambridgeshire.gov.uk/NR/rdonlyres/1BA212D3-E038-47C5-9E0A-50E2BDBE3AB7/0/CambridgeshireBBAFproposalFINAL.pdf.
The proposals include much of relevance for cyclists, including bus priority at junctions, a "bus gate" through the middle of Mitcham's Corner and more.
Created by Simon Nuttall // 1 thread
The cycleway between Fen Ditton and Horningsea
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Robin Heydon // 15 threads
New station that will serve the northern part of Cambridge, specifically the Science Park - but also by extension through the guided bus, villages to Northstowe.
This provides a good opportunity to construct another section of the Chisholm Trail (especially a link over the river and on to Newmarket Road). We must also ensure that any footbridge provides facilities for those with bikes AND that there is adequate cycle parking.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
A Camcycle member is looking at starting a local campaign group with the aim of getting a cycleway to connect the villages of Horningsea and Waterbeach along the B1047.
Please share your ideas and advice for the route here.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Roxanne (Cycling Campaign Officer) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Al Storer // 2 threads
Cycling and Walking provision at Cambridge Science Park is poor. Lets try and get it fixed
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?