22/02520/FUL | Installation of 11 sculptures and 5 benches (temporary)
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
limited to the area of Waterbeach Cycling Campaign:
One issue found for 'conflict':
Created by Gabriel Bienzobas // 1 thread
Proposed temporary installation of art structures than in some cases will create conflict and cause narrowing at certain points in the Cam tow path towards Waterbeach.
3 threads found for 'conflict':
A discussion on issue
Ranelagh Road cycle/pedestrian conflicts
User 1085 (deleted)
posted
A discussion on issue
Regent Street (Cambridge) bus/cycle gate
MJR
posted
A discussion on issue
Cycle path with give ways
fishter
posted
No library items found for 'conflict'.
No planning applications found for 'conflict'.