Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Waterbeach Cycling Campaign:

  • S/0874/19/FL Unit 330 Science Park - front extension and new cycle park

    Created by Matthew // 1 thread

    Unit 330 is a circa 30,000 sq. ft over 2, 330 , Cambridge Science Park, Milton, CB4 0WN

    First Floor front extension. Window and external door renewal. External repairs to existing area of hard and soft landscaping. Reduction of car parking spaces and provision of new bin store and cycle shelter.

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0874/19/FL&theTabNo=3

    (location is approximate)

    Please sign in to vote.
  • S/1312/19/OL Milton Road Impington - 50 residential dwellings & community park

    Created by Matthew // 1 thread

    Outline application for planning permission with all matters other than access reserved, for the development of up to 50 residential dwellings and a Community Park to provide recreation and leisure facilities, including a community building, and associated works.

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1312/19/OL

    Please sign in to vote.
  • S/4615/18/OL 28,000sqm office and R&D space

    Created by Roxanne (Cycling Campaign Officer) // 1 thread

    Outline Application for the erection of up to 28,000sqm of mixed B1 (a) offices, B1 (b) research and development, B1 (c) light industrial, B2 general industrial, B8 storage and distribution, and A1/A3 amenity café, with all matters reserved (Access from Beech Road, Appearance, Landscaping, Layout and Scale)

    Land To The West Of Cambridge Research Park, Beach Drive, Landbeach, CB25 9TL

    South Cambridgeshire

    Application reference : S/4615/18/OL

    Please sign in to vote.
  • #camcyclequest - a treasure hunt by bike for the 2019 Festival of Cycling

    Created by David Earl // 1 thread

    We are planning a treasure hunt for the 2019 Cambridge Festival of Cycling in September.

    The idea is to produce a pocket-size, attractively-produced booklet with a suggested route and clues to solve, items to collect and so on, which will be sold for a modest price. There would be a prize.

    This topic is a place to discuss ideas for this. I (David Earl) will be taking the lead in getting this together. Roxanne and Anna are seeking funding partners.

    If you'd like to help, please say so in the thread.

    Just one thing though - please don't put clue suggestions or answers here! If you do chances are people taking part will have read them, which rather spoils the fun.

    Please sign in to vote.
  • S/4629/18/FL Science Park - new hotel & office on site of Trinity Centre

    Created by Matthew // 1 thread

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/4629/18/FL&theTabNo=3

    Hybrid Planning Application comprising in Detail the demolition of the gym, Trinity Centre and Innovation Centre and the construction of hotel with gym, restaurant, café and business suite; and a building comprising multi-storey car park and three storey commercial floorspace (B1 floorspace to the first and second floor; flexible accommodation to the ground floor (A1, A2, A3, A4, A5, B1, D1 and/or D2)) along with associated access, infrastructure and landscaping, and the change of use of the Trinity Centre to B1 as part of a phased development; in Outline the construction of a building up to seven stories to provide B1floorspace, with all matters reserved.

    24, Cambridge Science Park, Milton, Cambridge, Cambridgeshire, CB4 0FN

    Please sign in to vote.
  • Mill Road (transporation) Survey (for edit)

    Created by Aldo // 1 thread

    In the coming weeks we, UoC Students from the Cambridge Hub, are going to do a survey on Mill Road in order to find out how people get to Mill Road and how they interact with it. The survey will be compared with the survey done last November in order to build momentum for the car-free Mill Road project.

    We would love your input. Please give suggestions below.

    For the survey, click on the link below.

    Deadline for edits is this friday.

    Please sign in to vote.
  • 21-month closure of cycle path from Cambridge North to Milton Road

    At the end of this blog post, it's reported that the segregated cycle path from Cambridge North station to the north of the Business Park will be closed to cyclists from March 2019 to December 2020 (a period of 21 months), for utility works relating to development on the Cambridge North site. Cyclists are to be diverted to the south side path (along the busway); pedestrian access on the north side will apparently be maintained.

    In particular, this appears to prevent cyclist use of the recently opened gate at the south end of the Business Park for the duration of the works (unless perhaps one pushes one's cycle). Getting from or through Cambridge North to the Science Park will be less convenient, too.

    Full text from Camcycle blog post. (Robin Heydon tells me this information originally came from Brookgate.)

    Development at Cambridge North

    Early works have begun on the further development around Cambridge North, where new offices and a hotel will be built. Within the next couple of months, a major cyclist diversion will be put in place which reroutes cyclists accessing the station via the segregated path along Cowley Road. This will be closed to allow utility works from Milton Road down to the station. Cyclists will be redirected along the Busway cycleway from Milton Road. There will continue to be road access for cyclists to the industrial and residential units off Cowley Road (including the Camcycle office), but not beyond this point. Note that there will be a signifidant increase in construction traffic along Cowley Road.

    Please sign in to vote.
  • S/0296/19/DC Science Park - access from guided busway (eastern entrance)

    Created by Matthew // 1 thread

    While this is a discharge of condition 12 of a previous application this is quite a substantial project in its own right. It looks like a significant improvement, with a wide pathway for accessing the site, a bunch of fancy architecture (some sort of series of archways over the path), and even a parallel Zebra over one of the Science Park internal roadways.

    See part 6 of the D&A statement for several mentions of Camcycle input.

    While I am making this an issue I do not see any immediate reason to send in a response, but those involved with the pre-application talks may want to double-check, possibly even send a letter of support if happy.

    ...

    Discharge of condition 12 (a scheme detailing the widening of the footway to allow for shared use walking and cycling and a scheme showing the layout and design of the plaza area to the East of the site, including vehicle circulation, pedestrian routes, kiosks, shelters, bollards and other ancillary structures) pursuant to planning permission S/3590/17/VC Transport Plaza, Cambridge Science Park, Cambridge, CB4 0FJ http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0296/19/DC South Cambridgeshire Application reference : S/0296/19/DC

    Please sign in to vote.
  • S/0193/19/FL Rosemary Road Waterbeach - 9 new dwellings

    Created by Matthew // 1 thread

    The cycle parking dimensions look good, almost lifted straight out of the guide. Main issues are: garden gate doors are only 90cm, the Sheffield stands are affixed with only M12 bolts, and the cycle shelter doors are not lockable.

    ...

    Construction of 9 dwellings and new access Land to the rear of 10A, Rosemary Road, Waterbeach, Cambridge, Cambridgeshire, CB25 9NB http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0193/19/FL South Cambridgeshire Application reference : S/0193/19/FL

    Please sign in to vote.
  • Vehicle free tradespeople

    Created by Nick Flynn // 1 thread

    A list of carpenters, cleaners, electricians, plumbers and other tradespeople who can attend jobs in Cambridge without needing a car parking space (for example those arriving by cargo bike) would be a useful resource.

    It could be used by people who cannot offer car parking, or those who would prefer to choose someone who can arrive by sustainable transport.

    Please sign in to vote.
  • 18/1782/FUL Cowley Road - Office development

    Created by Matthew // 1 thread

    Proposes 120 cycle parking spaces via two-tier racks.

    ...

    Four storey office development (B1 use) with associated car and bicycle parking, plant room, sub station and landscaping. William James House 50 - 55 Cowley Road Cambridge Cambridgeshire CB4 0WU https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PI6V39DXHMI00 Cambridge Application reference : 18/1782/FUL

    Please sign in to vote.
  • City Changer Cargo Bike

    Created by Anna Williams – Comms Officer // 2 threads

    The county council cycling team are involved in a 3-year project funded by the EU’s Horizon 2020 Research Programme to grow delivery and passengers by bike, cargo bike and e-cargo bike in 100 cities. The project called 'City Changer Cargo Bike' was launched to an audience of EU institutions, national and regional governments, advocacy organisations and business leaders in October 2018.

    Please sign in to vote.
  • Planning application responders

    Created by Matthew // 2 threads

    I'm thinking of convening a workshop or possibly simply an informal gathering (possibly at a pub or cafe) to discuss techniques and ideas for responding to planning applications. The timing is right, I think, with the approval of the new Local Plans for Cambridge and South Cambridgeshire.

    All are welcome, whether you already participate or are just interested in getting involved.

    I would like to gauge interest first and then we can pick a suitable time and place.

    Please sign in to vote.
  • S/3269/18/FL 436 Science Park - extension to building and cycle park

    Created by Matthew // 1 thread

    Proposed site plan: it looks like they are extending an existing set of wheel-benders by adding more wheel-benders.

    ...

    Extension to the building, extension to an external plant compound, new generator compound, extension to existing cycle parking and new bin enclosure.

    436, Cambridge Science Park, Milton, Cambridge, Cambridgeshire, CB4 0QA

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3269/18/FL

    South Cambridgeshire

    Application reference : S/3269/18/FL

    Please sign in to vote.
  • Camcycle quarterly magazine

    Created by Anna Williams – Comms Officer // 5 threads

    The magazine cheanged to a quarterly publication from December 2018 and is published seasonally in Spring (March), Summer (June), Autumn (September) and Winter (December).


    The aims of the magazine are to:
    – Continue to provide an update to our members and supporters on Camcycle's recent work and campaigns
    – Continue to cover all aspects of cycling from planning application to personal stories and build on this foundation to make sure we are giving a voice to people of all ages and backgrounds
    – Continue to strike the balance between a professional-looking magazine with a grassroots feel
    – Proactively set the agenda for decision-makers, clearly communicating our vision through in-depth features on aspects of our policy and manifesto
    – Develop and showcase our work with local partners including businesses and organisations who support our charity's aims and/or provide examples of best practice in working for more, better and safer cycling in and around Cambridge
    – Drive forward bold and successful campaigns for cycling, providing all who read the magazine with clear calls to action so that they can get involved and amplify our voice
    – Provide rewarding and sustainable roles to volunteers; attracting new members to the team and recognising long-term contributors.
    – Appeal to non-members of Camcycle and even non-cyclists; taking them on the journey from awareness to action. Join. Donate. Volunteer. Share our vision. Support our work and help create a vibrant and people-friendly city.

    Please sign in to vote.
  • DfT Policy Paper - Inclusive Transport Strategy

    Created by Matthew // 1 thread

    https://www.gov.uk/government/publications/inclusive-transport-strategy

    Lots of interesting stuff about inclusive transport regarding trains, buses, cars, public realm, streets and yes a bit about cycling too. Quotes:

    Shared Space:

    8.11 While we consider CIHT and DPTAC’s recommendations and how to take them
    forward, we are requesting that local authorities pause any shared space schemes
    incorporating a level surface they are considering, and which are at the design stage.
    We are also temporarily suspending Local Transport Note 1/11. This pause will allow
    us to carry out research and produce updated guidance.

    Objectives regarding Cycling:

    • Update Local Transport Note 2/08, which sets out the Department’s guidance to
    local authorities on designing safe and inclusive infrastructure for cyclists, to take
    account of developments in cycling infrastructure since its publication in 2008 and
    the responses to the draft AAP consultation and publish a revised version by early
    2019;
    • By 2020, explore the feasibility of amending legislation to recognise the use of
    cycles as a mobility aid71 in order to increase the number of disabled people
    cycling.

    Please sign in to vote.
  • S/0095/18/CC Waterbeach Primary School expansion

    Created by Matthew // 1 thread

    http://planning.cambridgeshire.gov.uk/swift/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0095/18/CC&theTabNo=3

    Development of Waterbeach Community Primary School from a 2 form entry school to a 3 form entry (630 places) including a two storey teaching block extension with a single storey link, front entrance, additional car and cycle/scooter parking provision and external landscaping works.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top