Highway Code changes
A bill is being put forward to sentence any cyclist convicted of dangerous cycling to a 14 year prison term.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Waterbeach Cycling Campaign:
sound+fury // 1 thread
A bill is being put forward to sentence any cyclist convicted of dangerous cycling to a 14 year prison term.
Demolition of 32no existing flats and garages, and erection of 75no new affordable dwellings, including 4no houses and 71no apartments, a new community facility, car parking, landscaping and associated works.
67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP
Cambridge
Application reference : 19/1616/FUL
There's a whole bunch of locations reported for this Cambridge Cow sculpture exhibit.
I've already spotted one that gets too close to a dropped kerb in Station Square. More eyes needed to look through all the proposed locations.
Created by Chris Howell // 1 thread
This is a suggestion to create a Dutch style cycle map for the area around Cambridge and get the waypoints and routes marked on the ground to help navigation by bike, and then use it to measure progress on creating better routes.
Created by Anna Williams – Comms Officer // 1 thread
As part of the City Council's plan to build 500 new homes in Cambridge by 2022, Cambridge Investment Partnership (CIP) is proposing to build around 78 new council-rented homes and a new community facility on Campkin Road.
EIA screening opinion for up to 4,801 sqm of operational police accommodation and ancillary functions
Land at Milton
South Cambridgeshire
Application reference : S/3011/19/E1
Created by Roxanne (Cycling Campaign Officer) // 36 threads
We're moving forward on our policy project. This thread is to discuss the various policies and move them towards publication.
Tom McKeown // 3 threads
Events to promote cycling within Histon and Impington. Raise awareness for groups other activities.
Created by Richard Moss // 1 thread
For discussing swept path analysis matters
Created by Anna Williams – Comms Officer // 1 thread
Group looking at issues for active travel in the Chesterton area.
Created by Cllr Ian Manning // 8 threads
I've recently moved to be the Lib Dem lead on the County Council's Highways & Infrastructure committee.
I want to start working through in detail bad and good TM examples with officers to understand whether it's specific sets of contractors that are poor, whether they aren't compliant with the current policy and/or whether I agree with our officers about whether they are.
For this I need a Cambridgeshire wide list of both good and bad, with locations - so it would be good to get some from Cambridge and other nearby Cycle Campaigns.
Tom McKeown // 1 thread
New South Cambridgeshire Police station proposed for land adjacent to Milton Park & Ride.
Created by Robin Heydon // 2 threads
GCP should be applying for the second Tranche. This was discussed at the May monthly meeting where we created a list of possible schemes. This issue is designed to both create additional items for this list, and also expand on the needs of each of these items.
Unit 330 is a circa 30,000 sq. ft over 2, 330 , Cambridge Science Park, Milton, CB4 0WN
First Floor front extension. Window and external door renewal. External repairs to existing area of hard and soft landscaping. Reduction of car parking spaces and provision of new bin store and cycle shelter.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0874/19/FL&theTabNo=3
(location is approximate)
Outline application for planning permission with all matters other than access reserved, for the development of up to 50 residential dwellings and a Community Park to provide recreation and leisure facilities, including a community building, and associated works.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/1312/19/OL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Outline Application for the erection of up to 28,000sqm of mixed B1 (a) offices, B1 (b) research and development, B1 (c) light industrial, B2 general industrial, B8 storage and distribution, and A1/A3 amenity café, with all matters reserved (Access from Beech Road, Appearance, Landscaping, Layout and Scale)
Land To The West Of Cambridge Research Park, Beach Drive, Landbeach, CB25 9TL
South Cambridgeshire
Application reference : S/4615/18/OL
Created by David Earl // 1 thread
We are planning a treasure hunt for the 2019 Cambridge Festival of Cycling in September.
The idea is to produce a pocket-size, attractively-produced booklet with a suggested route and clues to solve, items to collect and so on, which will be sold for a modest price. There would be a prize.
This topic is a place to discuss ideas for this. I (David Earl) will be taking the lead in getting this together. Roxanne and Anna are seeking funding partners.
If you'd like to help, please say so in the thread.
Just one thing though - please don't put clue suggestions or answers here! If you do chances are people taking part will have read them, which rather spoils the fun.
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/4629/18/FL&theTabNo=3
Hybrid Planning Application comprising in Detail the demolition of the gym, Trinity Centre and Innovation Centre and the construction of hotel with gym, restaurant, café and business suite; and a building comprising multi-storey car park and three storey commercial floorspace (B1 floorspace to the first and second floor; flexible accommodation to the ground floor (A1, A2, A3, A4, A5, B1, D1 and/or D2)) along with associated access, infrastructure and landscaping, and the change of use of the Trinity Centre to B1 as part of a phased development; in Outline the construction of a building up to seven stories to provide B1floorspace, with all matters reserved.
24, Cambridge Science Park, Milton, Cambridge, Cambridgeshire, CB4 0FN
Created by Aldo // 1 thread
In the coming weeks we, UoC Students from the Cambridge Hub, are going to do a survey on Mill Road in order to find out how people get to Mill Road and how they interact with it. The survey will be compared with the survey done last November in order to build momentum for the car-free Mill Road project.
We would love your input. Please give suggestions below.
For the survey, click on the link below.
Deadline for edits is this friday.
Anon // 1 thread
At the end of this blog post, it's reported that the segregated cycle path from Cambridge North station to the north of the Business Park will be closed to cyclists from March 2019 to December 2020 (a period of 21 months), for utility works relating to development on the Cambridge North site. Cyclists are to be diverted to the south side path (along the busway); pedestrian access on the north side will apparently be maintained.
In particular, this appears to prevent cyclist use of the recently opened gate at the south end of the Business Park for the duration of the works (unless perhaps one pushes one's cycle). Getting from or through Cambridge North to the Science Park will be less convenient, too.
Full text from Camcycle blog post. (Robin Heydon tells me this information originally came from Brookgate.)
Development at Cambridge North
Early works have begun on the further development around Cambridge North, where new offices and a hotel will be built. Within the next couple of months, a major cyclist diversion will be put in place which reroutes cyclists accessing the station via the segregated path along Cowley Road. This will be closed to allow utility works from Milton Road down to the station. Cyclists will be redirected along the Busway cycleway from Milton Road. There will continue to be road access for cyclists to the industrial and residential units off Cowley Road (including the Camcycle office), but not beyond this point. Note that there will be a signifidant increase in construction traffic along Cowley Road.
While this is a discharge of condition 12 of a previous application this is quite a substantial project in its own right. It looks like a significant improvement, with a wide pathway for accessing the site, a bunch of fancy architecture (some sort of series of archways over the path), and even a parallel Zebra over one of the Science Park internal roadways.
See part 6 of the D&A statement for several mentions of Camcycle input.
While I am making this an issue I do not see any immediate reason to send in a response, but those involved with the pre-application talks may want to double-check, possibly even send a letter of support if happy.
...
Discharge of condition 12 (a scheme detailing the widening of the footway to allow for shared use walking and cycling and a scheme showing the layout and design of the plaza area to the East of the site, including vehicle circulation, pedestrian routes, kiosks, shelters, bollards and other ancillary structures) pursuant to planning permission S/3590/17/VC Transport Plaza, Cambridge Science Park, Cambridge, CB4 0FJ http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0296/19/DC South Cambridgeshire Application reference : S/0296/19/DC
The cycle parking dimensions look good, almost lifted straight out of the guide. Main issues are: garden gate doors are only 90cm, the Sheffield stands are affixed with only M12 bolts, and the cycle shelter doors are not lockable.
...
Construction of 9 dwellings and new access Land to the rear of 10A, Rosemary Road, Waterbeach, Cambridge, Cambridgeshire, CB25 9NB http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/0193/19/FL South Cambridgeshire Application reference : S/0193/19/FL
Created by Nick Flynn // 1 thread
A list of carpenters, cleaners, electricians, plumbers and other tradespeople who can attend jobs in Cambridge without needing a car parking space (for example those arriving by cargo bike) would be a useful resource.
It could be used by people who cannot offer car parking, or those who would prefer to choose someone who can arrive by sustainable transport.
Proposes 120 cycle parking spaces via two-tier racks.
...
Four storey office development (B1 use) with associated car and bicycle parking, plant room, sub station and landscaping. William James House 50 - 55 Cowley Road Cambridge Cambridgeshire CB4 0WU https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=PI6V39DXHMI00 Cambridge Application reference : 18/1782/FUL
Created by Heather Coleman // 1 thread
Alert: Fen Road Milton to be closed for resurfacing Friday 14th Dec. As there's no pavement, it will be totally closed even to pedestrians. However, given the terrible state of the road, one day's pain will be more than worth it.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Cllr Ian Manning // 1 thread
The County appointed an officer back in June to review parking policy across the County, starting with the City.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
A Camcycle member is looking at starting a local campaign group with the aim of getting a cycleway to connect the villages of Horningsea and Waterbeach along the B1047.
Please share your ideas and advice for the route here.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by cobweb // 40 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Roxanne (Cycling Campaign Officer) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Al Storer // 2 threads
Cycling and Walking provision at Cambridge Science Park is poor. Lets try and get it fixed
Created by Anna Williams – Comms Officer // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Heather Coleman // 1 thread
I've had a letter from the council. Not sure if someone put a copy through my door as they knew I was interested in the Fen Road, Milton, as it's dated 30th June which is over two weeks ago.
I think "suface dressing" ie loose chippings, is a totally inappropriate treatment for a road which has not that much motor traffic and rather a lot of cycle traffic. The loose chippings will be a skid and physical hazard for cyclists for months to come.